Tag: Caterham 420R Build
-

Post-Post Build Check and a Dash for Fuel
Caterham 420R post-build update covering follow-up check work and the first dash for fuel before IVA.
-

Post Build Check
Caterham 420R post-build check covering inspection feedback and follow-up items after the main kit build was completed.
-

Build Session 37 : IVA Preparation and Tidy-ups
Final numbered Caterham 420R build session focused on IVA preparation and tidy-up work before inspection.
-

Build Session 36 : Repeaters, IVA, Mirrors, Wipers, Rear Hubs, Wings
Caterham 420R build session covering repeater lights, IVA preparation, mirrors, wipers, rear hubs, and wing work.
-

Build Session 35 : Front Wings, Handbrake Cable and Tidying Up
Caterham 420R build session covering front wing finishing, handbrake cable work, and general tidying before the final build stages.

